AGM Weds 28 April 2010 – Discuss Future of Pool
Full refurbishment to meet current safety standards (e.g. to include resurfacing of the cracked concrete area, addition of a footbath and shower and partitioning of the changing rooms) could easily cost 170 000 pounds, so the quoted costs are higher than previously thought. The current committee has been refused funding because we do not own the pool, and this problem is likely to occur in other attempts to find funding through formal grant-awarding bodies.
If you are interested in leading or supporting a bid to refurbish the existing pool or work towards building an indoor pool in Cottenham, then please come along to the AGM to have your say.